Overview
Partition system 2000_Nature
Spinner
Automation
GmbH
Markgröningen
In November 2025, after approximately 18 months of construction, Spinner Automation opened its new building in Markgröningen. The company headquarters now offers more space for projects, development, and collaboration – and at the same time reflects the company's working methods: open, transparent, and team-oriented.
| Builder | Spinner Automation GmbH |
| Architecture | MÖRK GmbH & Co KG |
| Photography | Huber Fotodesign |
| Partition system | 2000_Nature |
In detail.
The new building is bright, open, and functionally designed – a vibrant place. Customers can find their contacts directly at the entrance, and open areas demonstrate how development, assembly, and project teams collaborate. New meeting rooms, quiet zones, and a creative zone in the hall foster exchange and the generation of ideas.
The project placed particular emphasis on sustainability. The new building meets modern energy standards and creates the ideal conditions for future-oriented work processes. The 2000_Nature partition wall system makes a significant contribution to the system walls’ CO2-reduced and long-term design. The system’s glazing frames and door frames consist of a veneered solid wood profile. In this project, these were finished with a white-pigmented spruce veneer.
In addition, the floor and ceiling profiles are finished in anodised E6EV1. The all-glass elements provide sound insulation of 47 dB RwP. The newly developed HR 40 timber-framed door features a timber frame with a single rebate and sound insulation of 37 dB RwP. The wall is fully modular, like all solutions in the System Family 2000, so that future alterations and modifications can be carried out easily and without compromising performance.