Overview
partition system 2300; room-in-room-system Kubus II
WAS Luzern
Kriens
The Eichhof West site in Kriens marks the start of a new era for WAS Lucerne: for the first time, all services relating to the economy, employment and social affairs are brought together centrally under one roof – modern, sustainable and even closer to our clients.
| Builder | Anliker AG Generalunternehmung |
| Architecture | Gigon Guyer Partner Architekten |
| Photographer | Marco Leu |
| Partition system | 2300 |
| Room-in-raum-system | Kubus II |
In detail.
200 running metres of partition walls in the System 2300 range, featuring powder-coated profiles in a custom colour, as well as 57 small and larger Kubus II units with aluminium-framed doors, divide up the open-plan office spaces.
As individually planned room-within-a-room solutions for several people, Kubus II adapts flexibly to the requirements of every project. Micro-perforated ceiling and wall absorbers noticeably reduce reverberation and create a sense of calm where it is needed. Lighting, ventilation and technical systems are harmoniously integrated: flush-mounted, dimmable LED strip lights create a pleasant ambience, whilst customised media and power connections support modern working practices.
Flush-mounted glass walls, with no visible frames, create open and transparent spaces. The innovative 2300 partition wall system is the structural glazing variant of the 2000 system family and is characterised by its seamless, reflective glass appearance, whilst offering high levels of sound insulation and fire resistance. In this project, a combination of powder-coated profiles in a custom colour was installed alongside door leaves and door side panels veneered with spruce.