Overview
Partition wall 2000, 3400
Schachermayer,
Linz
The expansion of the goods receiving area at the Schachermayer wholesale company's headquarters in Linz has been completed. As part of the SCH 2020 project, a new 5-story building was constructed. The 2000 partition wall system with black-gray profiles was used in the AKZENT training and education center on the ground floor. To ensure maximum sound insulation, 100 mm aluminum frame doors were installed. In addition, there are new meeting and discussion areas that meet modern standards and promote a productive and constructive atmosphere for conversation.
| Builder | Schachermayer-Großhandelsgesellschaft m.b.H. |
| Architecture | ZT Architekt DI Helmut Siegel |
| Photography | SCH/M. Reichl |
| Partition wall System | 2000, 3400 Glasline |
In the office and training rooms above, the company opted for all-glass walls with 64 mm solid door leaves in concealed door frames with door side panels.
Here too, the profiles were powder-coated in black-gray. Colorful accents were created with the furnishings and warm wood tones.